About

Welcome to Electrical Engineering MaterialsExperiences of a Power Engineer.

Hi, My name is Phanindra Putta.

Phanibabu Author of ElectEngmaterials

Educational Qualification:

Diploma in Electrical and Electronics Engineering.

B.tech in Electrical and Electronics Engineering.

PGDC in Thermal Power Plant Engineering at NPTI NAGPUR India.

Previously I worked as an Asst.professor.

Now I am working as an Electrical Engineer.

Purpose of writing this blog:

I once thought that I should contribute myself to the plenty of resources available online since I started writing this blog. Now writing blog is became my passion. This blog aims to solve your practical Electrical Engineering problems with a right solution. So using my personal experience I’m writing this blog. I hope it will help you in any aspect related to Electrical Engineering.

Areas Covered:

The students who are not exposed to practical Core electrical concepts can get benefit from this site. It covers all the major Electrical Engineering topics related to the updated technology like Power Systems, Electrical Machines, Electrical Measurements, Electrical Interview questions, Numerical Relays and Protection concepts etc. Each and every topic explained with relevant examples which are taken from the Industrial applications.

Contact:

If you have any queries or suggestions please contact at

phanindra@electengmaterials.com

Follow Us:

On facebook:

On twitter:

Welcome your feedback.

5 thoughts on “About

  1. Vivek

    This is a good blog for electrical engineering subjects and topics and a great knowledge sharing platform. Keep up the good work.

    Reply
  2. Johnf385

    Pretty great post. I just stumbled upon your blog and wished to say that I’ve really enjoyed surfing around your weblog posts. In any case I will be subscribing to your feed and I am hoping you write again soon!

    Reply
  3. vsnmprasad mellacheruvu

    DEAR SHRI PHANINDRA GARU,
    NAMASKARAMS. I AM A RETIRED COMMERCIAL MANAGER (72 YEARS OLD) HAVING WORKED WITH VARIOUS MULTI-NATIONAL COMPANIES AT UAE, IRAQ AND IN INDIA. I WENT ABROAD AFTER WORKING WITH VOLTAS. WE HAVE COMPLETED A TURNKEY PROJECT TO THE FULLEST SATISFACTION OF IRAQI GOVERNMENT. I HAVE A SMALL ENQUIRY AND PLEASE EDUCATE ME ON THIS.
    HITHERTO, I WAS HAVING A TIBCON POWER CAPACITORS CAPACITOR OF 1 KVAR INSTALLED BY ELECTRICITY DEPARTMENT’S ELECTRICIAN IN MY RESIDENCE. AFTER THIS, I HAVE CONSTRUCTED 2 FLOORS, AND I HAVE 3 X 3PHASE METERS AND 1 X 1 SINGLE PHASE METER. RECENTLY I BOUGHT 1 NO. 4 KVAR TIBCON POWER CAPACITOR FOR INSTALLATION IN MY HOUSE, AS POWER LOAD HAS INCREASED FOUR FOLD AND THE ONE INSTALLED (1 KVAR UNIT) HAS FUSED OUT. KINDLY GUIDE ME WHETHER I CAN INSTALL THIS 4 KVAR CAPACITOR FOR ONE OF THE 3 PHASE METERS. IF IT IS NOT SUITABLE, KINDLY GUIDE ME AS TO WHICH UNIT I SHOULD INSTALL TO CONTAIN HUGE POWER BILLS. THE LOAD IS AS FOLLOWS:
    1. GROUND FLOOR: 1 COMPUTER, 2 ACS, 2 FRIDGES, 2 TVs, 2 GEYSERS, 9 FANS, 2 WASHING MACHINES, 2 WATER LIFTING MOTORS, 20 TO 26 BULB POINTS – 3 PHASE METER.
    2. 1ST FLOOR: 2 COMPUTERS, 1 AC, 1 FRIDGE, 1 TV, 8 FANS, 1 WASHING MACHINE, 10 BULB POINTS. – 3 PHASE METER
    3. 1ST FLOOR: 1 FRIDGE, 4 FANS, 8 BULB POINTS, 1 GEYSER, 1 TV – SINGLE PHASE METER
    4. 2ND FLOOR: 2 SEWING MACHINES, 10 FANS, 1 TV, – 3 PHASE METER
    PLEASE GUIDE ME IN THIS REGARD. YOUR EARLIEST REPLY IS APPRECIATED MOST.

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *