MENU
  • Home
  • CORE AREAS
    • Electrical Machines
    • Power Systems
    • Electrical Measurements
    • Protection
    • Renewable Energy
  • Numerical Relays
  • AE EXAM
  • About
  • CONTACT US
  • Privacy Policy
ELECTRICAL ENGINEERING MATERIALS
Skip to content
  • Home
  • CORE AREAS
    • Electrical Machines
    • Power Systems
    • Electrical Measurements
    • Protection
    • Renewable Energy
  • Numerical Relays
  • AE EXAM
  • About
  • CONTACT US
  • Privacy Policy
Auto Changeover Scheme for Two Incomers and One Bus-coupler

Auto Changeover Scheme:

Auto Changeover Scheme Introduction: In this post the Auto Changeover Scheme for two incomers and one Bus-coupler system is explained. In Industries for distribution of electrical power with reliable supply… Read more »

Protection    Auto Changeover, Dead Bus Causes, Momentary Paralleling, One Buscoupler, Two Incomers

High Impedance Restricted Earth Fault Protection: [64H]

In this post, we are going to see, how the High Impedance Restricted Earth fault protection scheme works by using Metrosil and Stabilizing Resistors. Why REF protection is required while… Read more »

Protection    High Impedance REF, Metrosil, Neutral CT, REF Connecting Diagram, REF protection, Stabilizing Resistor, Transformer
Single Line Diagram of Power Plant

Single Line Diagram of Power Plant

In this post the Single Line Diagram of the typical Power plant is explained, it covers the Bus Transfer methods also. Single Line Diagram-SLD gives information about how the Electrical… Read more »

Power Systems    Auto Transfer, BUS CHANGEOVER, Generator, GT, Momentary Paralleling, Power Plant, Single Line Diagram, SLD, ST, UAT
Vector Groups of Transformer

Vector Groups of Transformer:

VECTOR or PHASOR GROUPS: Vector or Phasor groups of transformers are used to denote different connection methods for polyphase transformers. This knowledge is required for connecting the poly-phase transformers in… Read more »

Electrical Machines    Dyn1, Dyn11, Groups, Phasor, Transformer Name Plate, Vector, Vector Groups Examples, YNd11
Block Diagram of Trivector Meter

Working of Trivector Meter:

Trivector Meter: Trivector meter is an energy meter which accurately measures all the parameters of supply such as voltage, current, power factor, active load, reactive load, apparent load etc., now… Read more »

Electrical Measurements    Active, Apparent, CT/PT Connection Diagram, Energy Meter, Main parts, Maximum Demand, Reactive, Trivector Meter, Working principle
Vacuum Bottle Parts of VCB

Practical Working of Vacuum Circuit Breaker

In this post, we are going to learn the practical working of a vacuum circuit breaker [VCB] in detail. A vacuum Circuit breaker is used in medium voltage Switchgear for… Read more »

Protection    Anti Pumping Relay, Circuit Breaker, Parts of VCB, Vacuum Circuit Breaker, VCB, VCB Operation

Posts pagination

« Previous 1 … 8 9 10 11 12 … 14 Next »

Enter Keyword

Topics

  • AE EXAM
  • Electrical Machines
  • Electrical Measurements
  • Numerical Relays
  • Power Systems
  • Protection
  • Renewable Energy

Recent Posts

  • Hydrogen Fuel Cell:
  • Green Hydrogen Plants:
  • BESS-Battery Energy Storage Systems:
  • Solar PV Module with High-Efficiency:
  • Transformer Losses and Mitigation Methods:

© 2014-2025 ElectEngMaterials

HOME